The office.
The beams mark the frame for the concrete slab that has to be made during this day. The room in the back has already got bamboo reinforcement placed, the front room still has to be prepared.
Because of the wet land, trucks can not drive all the way to the slab, so we have to carry sand and gravel in ricebags from the drop point to the concrete mixer, a distance of around 15 meters. I have no clue how many kilos we carried during this day, but to call it a real workout is for sure not an underestimation!
Koe Taw
Pah Me
Phillipa in charge of the concrete mixer.
We tested out different color combinations, and ended up adding a touch of black color.
Work in progress
Peter, with the finishing touch, as always!
Sunset! Beautiful light, a cooler breeze, and ready for the final effort!
Albert washing the finished part of the slab to make it even more smooth.
Pah Me and Si Da Pa filling up the last part.
With Si Da Pa`s steady hand the floor becomes flat,...
...and with his calm and thoughtful manners and good overviewing skills, the work moves easily on.
even though it gets a bit dark...
Almost finished!















Bra gjeng og det er utrolig hva dere får til. Vi høres :)